A19 · Slip road at A19 northbound access
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound Boldon Exit Slip Road. Lane 1 Closure
Official National Highways closures on the A19 (North East England corridor): what is closed now, tonight and over the next seven days, by junction and direction.
No closure is listed as active now. That is not a guarantee of clear traffic – unplanned incidents can appear at any time.
Official snapshot · 17 Nov 2026, 17:15 UK time: 0 closures active now on the A19, 11 active or starting within 24 hours and 11 listed for the next 7 days. Next scheduled start: 17 Nov 2026, 20:00 GMT. Zero is not an all-clear.
Planned and unplanned road or lane closures. Planned records are limited to the next seven days so the list stays useful before a journey.
All types · Any time · No search term
Blue badges: motorways · Green badges: A-roads. Badge colours show route families, not road conditions.
0 closures are active now on the A19, 11 active or starting within 24 hours, and 11 listed for the next seven days.
The latest start time National Highways currently publishes is 17 Nov 2026, 20:00 GMT; works starting later this week are not in the feed yet, so they are not counted.
Official snapshot available from the server; the page refreshes it while open.
Latest National Highways closure snapshot · 17 Nov 2026, 17:15 UK time
This lists closure records, not congestion, traffic speeds or an all-clear.
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound Boldon Exit Slip Road. Lane 1 Closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound from A168 South Kilvington to Chapel Farm. Slip Road Closure.
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Southbound Entry Slip at Herrington Interchange. Slip Road Closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 northbound A67 Crathorne Interchange lane 2 closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound Hylton Bridge. Lane 1 Closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Redhill Overbridge northbound lane 2 closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 05:00 GMT
A19 Redhill Overbridge northbound lane 2 closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19/A1027 Stockton Ring Road northbound exit slip road closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19/A1046 Portrack Interchange southbound entry slip road closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Southbound Entry from A184 Testos. Lane 1 Closure.
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Southbound Chester Road Exit Slip Road Closure.
Powered by National Highways’ Transport Data Feeds · Coverage and limitations
Most planned work happens overnight. Each night counts records whose official times overlap 20:00–06:00 UK time.
7 more tonight in the live list above.
Weekend 20 Nov–23 Nov: 0 closure records on the A19. Weekend closures →
Typical traffic flow by day and hour, averaged from National Highways WebTRIS counts between 2026-06-03 and 2026-06-30 – the latest validated counts available, which National Highways publishes with a delay. Darker squares carry more vehicles. Flow is not speed: during heavy queues fewer vehicles pass a sensor.
Traffic counts: National Highways WebTRIS, Open Government Licence v3.0. One counting site per direction; other sections of the A19 can differ.
Northbound from Thirsk. Key junctions and interchanges in driving order (main places along the route).
Forecast for 5 points from Thirsk to Seaton Burn. Wind in mph, temperature in °C, rain in mm.
| Point on the route | Next hour | Next 24 h | Max wind | Rain, 24 h | Flags |
|---|---|---|---|---|---|
| Thirsk | Rain 5°C | 5° to 7°C | 10 mph | 2.5 mm | none flagged |
| Middlesbrough | Rain 6°C | 6° to 7°C | 12 mph | 7.8 mm | none flagged |
| Sunderland | Rain 7°C | 6° to 8°C | 18 mph | 8.6 mm | none flagged |
| Tyne Tunnel | Rain 6°C | 6° to 8°C | 17 mph | 8.5 mm | none flagged |
| Seaton Burn | Rain 6°C | 6° to 8°C | 18 mph | 8.6 mm | none flagged |
Weather forecasts: MET Norway Locationforecast (CC BY 4.0). Forecast fetched 17 Nov 2026, 16:50 GMT; model run 17 Nov 2026, 13:20 GMT.
A forecast is not a road restriction. Closures, speed limits or bans for high-sided vehicles are set by National Highways and appear in the closure list above when published.
Closure records that first appeared in the official feed during the last 24 hours on the A19.
11 new records, including 5 full carriageway.
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19/A1027 Stockton Ring Road northbound exit slip road closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19/A1046 Portrack Interchange southbound entry slip road closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound Boldon Exit Slip Road. Lane 1 Closure
Starts 17 Nov 2026, 20:00 GMT · ends 18 Nov 2026, 06:00 GMT
A19 Northbound from A168 South Kilvington to Chapel Farm. Slip Road Closure.
7 more – see all new records
Closure records listed for the A19 at the latest scheduled snapshot of each day. Counts of records, not congestion.
Route facts that do not change with the live feed.
The A19 trunk road runs north from near Thirsk through Teesside, past Middlesbrough, Stockton, Hartlepool and Sunderland, under the River Tyne in the Tyne Tunnel and on to the A1 at Seaton Burn. It is the main north–south road along the east side of the North East, parallel to the A1.
| Official designation | A19 · Trunk A-road (all-purpose road) |
|---|---|
| Starts | Near Thirsk, North Yorkshire (National Highways section) |
| Ends | Seaton Burn, north of Newcastle (A1) |
| Length | Varies by section; see route notes |
| Counties and regions | North Yorkshire, Teesside, County Durham, Tyne and Wear, Northumberland edge |
| Directions | Northbound from Thirsk |
| Road charges | Charge applies on part of the route (see below) |
| Managed by | National Highways (Strategic Road Network in England). South of Thirsk the A19 continues to York and Doncaster but is not part of the National Highways network there. |
The Tyne Tunnel charges a toll. It is barrier-free, so drivers pay online or by account after travelling; check the operator for the payment deadline.
No closure on the A19 is listed as active in the latest official snapshot. That is not a guarantee of clear traffic: incidents can happen at any time.
The A19 runs from Near Thirsk, North Yorkshire (National Highways section) to Seaton Burn, north of Newcastle (A1). South of Thirsk the A19 continues to York and Doncaster but is not part of the National Highways network there.
Yes, for the Tyne Tunnel. It is barrier-free, so you pay online or by account after travelling.
No. This page focuses on planned and unplanned closure records from National Highways. Congestion or other disruption can exist without a closure record.
It means no matching closure records were returned in the current feed and filters. It is not an all-clear for traffic conditions.
Records active now come first, then closures starting within the next seven days, then records whose start has passed but which National Highways does not currently mark as active.
Shortly before you leave. On the road, follow signs, police directions and official diversions – they always take priority over this page.
Route facts are compiled from official and public reference sources and reviewed editorially; live records come only from National Highways. Road signs and official instructions always take priority.