A12 northbound access from A1023
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 12 entry slip road closure
Official National Highways closures on the A12 (London to East Anglia corridor): what is closed now, tonight and over the next seven days, by junction and direction.
No closure is listed as active now. That is not a guarantee of clear traffic – unplanned incidents can appear at any time.
Official snapshot · 17 Nov 2026, 17:15 UK time: 0 closures active now on the A12, 11 active or starting within 24 hours and 11 listed for the next 7 days. Next scheduled start: 17 Nov 2026, 21:00 GMT. Zero is not an all-clear.
Planned and unplanned road or lane closures. Planned records are limited to the next seven days so the list stays useful before a journey.
All types · Any time · No search term
Blue badges: motorways · Green badges: A-roads. Badge colours show route families, not road conditions.
0 closures are active now on the A12, 11 active or starting within 24 hours, and 11 listed for the next seven days.
The latest start time National Highways currently publishes is 17 Nov 2026, 21:00 GMT; works starting later this week are not in the feed yet, so they are not counted.
Official snapshot available from the server; the page refreshes it while open.
Latest National Highways closure snapshot · 17 Nov 2026, 17:15 UK time
This lists closure records, not congestion, traffic speeds or an all-clear.
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 12 entry slip road closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 16 to Jct 22 mobile lane 1 closure (MP 120/7 to 140/7)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 22 to Jct 28 mobile lane 1 closure (MP 140/7 to 160/7)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 28 to Jct 33 mobile lane 1 closure (MP 184/3 to 164/3)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 22 to Jct 32 mobile lane 1 closure (MP 160/7 to 180/7)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 32 to Jct 33 lane closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 12 lane closure (MP 103/4 to 108/1)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 11 to Jct 17 mobile lane 1 closure (MP 100/7 to 120/7)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 12 exit slip road closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 30 exit slip road closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 southbound Jct 29 exit slip carriageway closure
Powered by National Highways’ Transport Data Feeds · Coverage and limitations
Most planned work happens overnight. Each night counts records whose official times overlap 20:00–06:00 UK time.
7 more tonight in the live list above.
Weekend 20 Nov–23 Nov: 0 closure records on the A12. Weekend closures →
Typical traffic flow by day and hour, averaged from National Highways WebTRIS counts between 2026-06-03 and 2026-06-30 – the latest validated counts available, which National Highways publishes with a delay. Darker squares carry more vehicles. Flow is not speed: during heavy queues fewer vehicles pass a sensor.
Traffic counts: National Highways WebTRIS, Open Government Licence v3.0. One counting site per direction; other sections of the A12 can differ.
Northbound from the M25. Key junctions and interchanges in driving order (main places along the route).
Forecast for 4 points from Brentwood (M25 J28) to Copdock (A14). Wind in mph, temperature in °C, rain in mm.
| Point on the route | Next hour | Next 24 h | Max wind | Rain, 24 h | Flags |
|---|---|---|---|---|---|
| Brentwood (M25 J28) | Rain 11°C | 8° to 12°C | 15 mph | 0.3 mm | none flagged |
| Chelmsford | Cloudy 11°C | 8° to 12°C | 16 mph | 0.1 mm | none flagged |
| Colchester | Partly cloudy 11°C | 8° to 12°C | 17 mph | 0 mm | none flagged |
| Copdock (A14) | Cloudy 11°C | 8° to 12°C | 17 mph | 0.2 mm | none flagged |
Weather forecasts: MET Norway Locationforecast (CC BY 4.0). Forecast fetched 17 Nov 2026, 16:40 GMT; model run 17 Nov 2026, 13:20 GMT.
Closure records that first appeared in the official feed during the last 24 hours on the A12.
11 new records, including 4 full carriageway.
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 16 to Jct 22 mobile lane 1 closure (MP 120/7 to 140/7)
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 southbound Jct 29 exit slip carriageway closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 30 exit slip road closure
Starts 17 Nov 2026, 21:00 GMT · ends 18 Nov 2026, 05:00 GMT
A12 northbound Jct 12 entry slip road closure
7 more – see all new records
Closure records listed for the A12 at the latest scheduled snapshot of each day. Counts of records, not congestion.
Route facts that do not change with the live feed.
The A12 runs north-east from London into Essex and Suffolk. National Highways manages the trunk section from the M25 at Brentwood (junction 28) past Chelmsford and Colchester to Ipswich, where it meets the A14. It is the main road between London and the Essex towns, Colchester and Ipswich.
| Official designation | A12 · Trunk A-road (all-purpose road) |
|---|---|
| Starts | London (the National Highways section begins at M25 junction 28, Brentwood) |
| Ends | Ipswich area (A14 at Copdock) |
| Length | Varies by section; see route notes |
| Counties and regions | Essex, Suffolk |
| Directions | Northbound from the M25 |
| Road charges | No toll on the National Highways section |
| Managed by | National Highways (Strategic Road Network in England). Inside London the A12 is managed by Transport for London. |
No toll applies on the A12.
Roadworks on connecting motorways or A-roads can affect a journey even when there are no matching A12 closure records. Each linked page uses the same National Highways source.
Motorways and A-roads serving Kent, the south coast and London approaches.
Check connecting roads before a longer journey:
No closure on the A12 is listed as active in the latest official snapshot. That is not a guarantee of clear traffic: incidents can happen at any time.
The A12 runs from London (the National Highways section begins at M25 junction 28, Brentwood) to Ipswich area (A14 at Copdock). Inside London the A12 is managed by Transport for London.
At Copdock interchange south-west of Ipswich.
No toll applies on the A12.
No. This page focuses on planned and unplanned closure records from National Highways. Congestion or other disruption can exist without a closure record.
It means no matching closure records were returned in the current feed and filters. It is not an all-clear for traffic conditions.
Records active now come first, then closures starting within the next seven days, then records whose start has passed but which National Highways does not currently mark as active.
Shortly before you leave. On the road, follow signs, police directions and official diversions – they always take priority over this page.
Route facts are compiled from official and public reference sources and reviewed editorially; live records come only from National Highways. Road signs and official instructions always take priority.